In this guide · 10 practical sections

A product brief built around jacket & outerwear
An outerwear enquiry needs the intended weather exposure, layering and use case before a fabric is selected. A lightweight rain shell, softshell jacket and fashion overshirt have different development and evidence requirements. Define whether the brief is appearance-led or requires specific tested performance.
Fabric and component choices
List shell, lining, insulation or membrane where applicable, interlining, zipper and elastic separately. Record fabric weight, finish, colour and care. A surface water-repellent treatment alone does not establish that the assembled garment is waterproof.
Construction details to resolve before quoting
Specify front fastening, storm flaps, hood adjustment, pockets, cuff and hem systems. If seam sealing or a performance construction is required, request a specific feasibility review. Show internal views and layer sequence; a styled photograph cannot define concealed construction.
What to review on the physical sample
Review mobility with the intended underlayer, fastening function, hood fit, pocket access and complete-garment performance where claimed. Agree the test method and acceptance requirement before quoting a claim. Material data does not automatically establish the result of every seam and opening.
From the technical file to a confirmed order
Prepare front and back drawings, material IDs, size measurements, tolerances, artwork, branding and a size-colour quantity matrix. The current starting point for this category is 300 pieces per style and colour. The actual quote confirms material availability and any special sourcing minimums. Keep open decisions visible rather than approving a file that silently assumes them.
Sampling, payment and the production calendar
New-client sampling follows a confirmed order. One PP sample per ordered model and colour is included, with shipping separate. Standard terms are 50% advance and 50% before shipment. Plan approximately 10–15 working days for PP sampling once materials are ready and 25–45 days for bulk after approval; the written project schedule governs.
Private-label finishing and delivery
Specify woven branding, validated care information, hangtags, bags, size stickers and carton assortments. Our design templates use Made in TURKIYE; production origin and artwork need confirmation for the actual garment. Give the destination and delivery term so transport and import responsibilities can be reviewed alongside the garment price.
Build the right version.
Styles to discuss
- Lightweight shell by review
- Softshell jacket
- Lined casual jacket
- Layered outerwear
Before the PP sample
- Shell/lining specification
- Closure and pocket function
- Weather-claim evidence
- Mobility and layering
These are development directions, not a live stock catalogue. Send the actual model and technical requirements for feasibility review.
Connect the next decision.
Detailed fabric and production guides
Questions, answered
What should I send for a jacket & outerwear quotation?
Send the current technical file, front/back visuals, material requirements, measurements, colours, quantities per size and colour, decoration, labels, packing and delivery destination. Highlight any undecided component.
What is the minimum for this product?
The starting point is 300 pieces per style and colour. Custom materials and trims can require separate supply minimums; the actual order needs review.
Can I order a sample before placing my first order?
No. New-client PP sampling follows order confirmation under the agreed commercial terms. The online preparation tools are free; they do not place an order or provide pre-order physical development.
How do I approve the final product?
Refer to the sample ID and technical file revision. Approve fit, material, shade, decoration, labels, packing and quantity separately and resolve pending points before releasing bulk production.