In this guide · 7 practical sections

Give every reference an identity
Assign the style, revision, sample ID, fabric reference and colour standard. Put the same identifiers on comments, the measurement review and the order matrix. When files change, identify the superseded revision and ask the team to acknowledge the current one.
Approve fit through measurements and use
Check the agreed points of measure and tolerances and record how the garment was measured. Review movement and the intended layering. A comment such as “looks fine” may approve appearance without resolving an out-of-tolerance chest measurement or an uncomfortable opening.
Approve material and colour separately
A fit sample in substitute fabric cannot approve final hand feel, shade or care performance. Record any substitution and what remains open. Confirm the relevant physical swatch, lab dip or production sample, including visible rib, lining and trim matches.
Approve decoration and label content
Check method, dimensions and placement on the intended size and fabric. Confirm logo rights, artwork revision, composition, origin and validated care content. The free label designer creates watermarked proofs using Made in TURKIYE; production artwork and actual origin still require approval.
Approve packing and order quantities
Reconcile the size-colour matrix, label sizes, SKU data, bags, carton assortments and marks. A correct garment packed against the wrong SKU is a delivery problem. Separate the packed sample approval from the garment fit approval and record agreed tolerances in the commercial order.
Issue a clear release or revision request
Mark each item approved, revise or pending and name the decision owner. Bulk release should refer to the current specification and record any accepted exceptions. If a correction changes material, construction or processing, confirm whether a new sample and revised schedule are required before release.
Connect the next decision.
Questions, answered
Where should I record these decisions?
Use the brand workspace and tech pack builder, identify pending items and export a watermarked PDF for review. The file becomes a production instruction only after the parties approve its scope.
Can this guide replace the quotation or contract?
No. Confirm current product feasibility, responsibilities, price, timing and commercial terms in the written order.