In this guide · 6 practical sections

Approve the inspection rules with the order
Name the sealed sample, current measurement chart, tolerances and carton requirements. Give examples of defect categories for the product. A visible mark on a front panel, a seam failure under agreed use, and a missing carton label may need different actions. If using a sampling plan, write the scheme, lot definition and acceptance criteria before inspection.
Catch repeated problems early
Review first pieces for fabric shade grouping, workmanship and key measurements while corrections are still practical. If a seam issue repeats, identify the line, affected lots, size range and timing. Hold the relevant goods while the cause is investigated rather than mixing them with released units.
Track the action against the evidence
A useful record contains style and colour, lot or carton reference, measurement point, expected result, observed result, photo and proposed remedy. Identify who can authorise repair, replacement or an exception. After repair, verify the original issue and check that the repair did not introduce another one.
Separate production completion from shipment release
Match the final packed size-colour quantities to the order, document any shortage or substitution, then confirm the inspection disposition and carton count. A passed sample inspection does not prove every unit was checked. Agree which issues require broader sorting and who signs off.
Decision worksheet
| Status | Record | Next decision |
|---|---|---|
| Hold | Affected lots and photos | Contain the problem before packing |
| Rework | Correction and scope | Recheck affected goods |
| Release | Results, quantities and named approval | Hand over the confirmed shipment |
Put the decision into your production brief
Questions, answered
What happens if a lot does not pass?
Follow the agreed disposition: hold the affected lot, investigate, rework or sort where suitable, then recheck and obtain a documented release.
Should I ask for an inspection report on every order?
Agree the evidence needed before the order. Higher-risk first runs, new fabrics and changed constructions can justify additional checks.