In this guide · 6 practical sections

Buy the first run around one clear goal
If the first drop is meant to test fit, keep fabric and trim variables stable. If it is meant to test colour demand, hold fit and construction constant. A first run with several styles and colours changes too many variables and can split the budget across separate material commitments.
Use a size-colour matrix to expose choices
For an illustrative 600-unit launch with two 300-unit colours, a 30 / 75 / 105 / 60 / 30 split across XS–XL totals 300 for one colour. Start from your audience data and vary the ratio by colour if needed. The example is a planning exercise, not a recommended demand curve. Ask whether trims or fabric minimums still apply independently.
Keep an approved record ready for the reorder
Archive the final pattern ID, measurement chart, supplier material references, shade standard, print file, placement and packing instructions. Ask which materials can be reordered, whether the old dye lot is still available and how a new lot will be checked. Reorder lead time should be reconfirmed.
Review outcomes by SKU
After release, record sold units, returns by reason and remaining stock by size and colour. Separate demand from availability: a size that sold out early did not have the same opportunity to sell as a well-stocked size. Send the revised matrix and any confirmed changes in one new purchase order.
Decision worksheet
| Priority | First-run decision | Reorder signal |
|---|---|---|
| Fit confidence | One stable material and controlled fit review | Returns and comments by size |
| Colour demand | Same pattern and finish across shades | Sell-through adjusted for availability |
| Margin control | Record total committed spend by SKU | Actual cost and stock remaining |
Put the decision into your production brief
Questions, answered
Should my first drop use five colours?
Only if you can support the quantity, material approvals and inventory by colour. Compare the cash and learning value of a focused range first.
Can I reorder by sending the same style name?
Use the approved revision, quantity matrix and current material references so the supplier can distinguish a true repeat from a requested change.